Scope of work:
The scope includes the comprehensive installation of the ventilation system at the Deutsches Museum (Phase 2). Rectangular and circular air ducts (Spiro), fittings, special components, and galvanized and stainless steel ductwork. Air handling units with various capacities, fans, heaters, coolers, heat recovery systems, humidifiers, and filter sections. Also included are fire and control dampers, sound attenuators (splitter and resonator types), louvers, grilles, air intake and exhaust elements, inspection components, thermal insulation, and connection and installation works.
Project status:
Works in progress since 02/2026.
