{"id":5384,"date":"2026-02-09T17:30:13","date_gmt":"2026-02-09T16:30:13","guid":{"rendered":"https:\/\/expateam.com\/?p=5384"},"modified":"2026-02-15T21:44:24","modified_gmt":"2026-02-15T20:44:24","slug":"rentschler-biopharma-laubheim-montaz-inslatacji-hvac","status":"publish","type":"post","link":"https:\/\/expateam.com\/en\/rentschler-biopharma-laubheim-montaz-inslatacji-hvac\/","title":{"rendered":"New BMS building Rentschler, Laupheim (HVAC Installations)"},"content":{"rendered":"<p data-path-to-node=\"2\"><b class=\"\" data-path-to-node=\"2\" data-index-in-node=\"0\">SCOPE OF WORKS:\u00a0<\/b><\/p>\n<p data-path-to-node=\"3\"><span class=\"\">The project involves the comprehensive installation of technical systems in the newly constructed <\/span><b class=\"\" data-path-to-node=\"3\" data-index-in-node=\"98\">BMS (Buffer Media Station)<\/b><span class=\"\"> facility for Rentschler Biopharma SE.<\/span><span class=\"\"> High precision is required due to pharmaceutical standards (<\/span><b class=\"\" data-path-to-node=\"3\" data-index-in-node=\"223\">GMP and Non-GMP zones<\/b><span class=\"\">).<\/span><\/p>\n<p data-path-to-node=\"4\"><b class=\"\" data-path-to-node=\"4\" data-index-in-node=\"0\">Key tasks and systems:<\/b><\/p>\n<p data-path-to-node=\"5,0,0\"><b class=\"\" data-path-to-node=\"5,0,0\" data-index-in-node=\"0\">Ventilation and Air Conditioning (RLT):<\/b><span class=\"\"> Installation of hygienic air handling units,<\/span><span class=\"\"> supply\/exhaust units,<\/span><span class=\"\"> and recirculation systems.<\/span><span class=\"\"> Includes rectangular and circular ductwork with full accessories and heat recovery systems (KVS).<\/span><\/p>\n<p data-path-to-node=\"5,1,0\"><b class=\"\" data-path-to-node=\"5,1,0\" data-index-in-node=\"0\">Cooling Systems:<\/b><span class=\"\"> Installation of water chillers,<\/span><span class=\"\"> pumps,<\/span><span class=\"\"> fittings,<\/span><span class=\"\"> and cooling pipelines.<\/span><span class=\"\"> Includes a cooling system for compressors in the adjacent Building 8.<\/span><\/p>\n<p data-path-to-node=\"5,2,0\"><b class=\"\" data-path-to-node=\"5,2,0\" data-index-in-node=\"0\">Heating and Steam:<\/b><span class=\"\"> Installation of heating water (PWW) and process steam (SD) and condensate (SD-K) systems,<\/span><span class=\"\"> including heat exchangers.<\/span><\/p>\n<p data-path-to-node=\"5,3,0\"><b class=\"\" data-path-to-node=\"5,3,0\" data-index-in-node=\"0\">Sanitary Installations:<\/b><span class=\"\"> Installation of vacuum and gravity drainage,<\/span><span class=\"\"> drinking water,<\/span><span class=\"\"> and advanced soft water (Weichwasser) systems with pressure boosting sets.<\/span><\/p>\n<p data-path-to-node=\"6\"><b class=\"\" data-path-to-node=\"6\" data-index-in-node=\"0\">Material and Assembly Requirements:<\/b><\/p>\n<p data-path-to-node=\"7,0,0\"><b class=\"\" data-path-to-node=\"7,0,0\" data-index-in-node=\"0\">Pipelines:<\/b><span class=\"\"> Work with stainless steel (e.<\/span><span class=\"\">g.,<\/span><span class=\"\"> 1.<\/span><span class=\"\">4401),<\/span><span class=\"\"> carbon steel (P250GH),<\/span><span class=\"\"> and copper.<\/span><\/p>\n<p data-path-to-node=\"7,1,0\"><b class=\"\" data-path-to-node=\"7,1,0\" data-index-in-node=\"0\">Joining techniques:<\/b><span class=\"\"> Proficiency in welding,<\/span><span class=\"\"> flange connections,<\/span><span class=\"\"> and press-fit systems.<\/span><\/p>\n<p data-path-to-node=\"7,2,0\"><b class=\"\" data-path-to-node=\"7,2,0\" data-index-in-node=\"0\">Support systems:<\/b><span class=\"\"> Installation based on professional rail systems (e.<\/span><span class=\"\">g.,<\/span> <b class=\"\" data-path-to-node=\"7,2,0\" data-index-in-node=\"72\">Sikla siFramo F80<\/b><span class=\"\">).<\/span><\/p>\n<p data-path-to-node=\"8\"><b class=\"\" data-path-to-node=\"8\" data-index-in-node=\"0\">Project Specifics:<\/b><span class=\"\"> The works will be carried out under strict cleanliness requirements.<\/span><span class=\"\"> Subcontractors must be proficient in reading technical documentation (LV) and performing assembly without material supply (<\/span><b class=\"\" data-path-to-node=\"8\" data-index-in-node=\"211\">Montage ohne Material<\/b><span class=\"\">).<\/span><\/p>\n<p data-path-to-node=\"9\"><b class=\"\" data-path-to-node=\"9\" data-index-in-node=\"0\">Project timeline:<\/b><span class=\"\"><br \/>\n03.<\/span><span class=\"\">2026\u201312.<\/span><span class=\"\">2026 <\/span><\/p>\n<p data-path-to-node=\"9\"><b class=\"\" data-path-to-node=\"9\" data-index-in-node=\"34\">Status:<\/b><span class=\"\"><br \/>\n<\/span><span class=\"\">Offer in preparation<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>SCOPE OF WORKS:\u00a0 The project involves the comprehensive installation of technical systems in the newly constructed BMS (Buffer Media Station) facility for Rentschler Biopharma SE. High precision is required due to pharmaceutical standards (GMP and Non-GMP zones). Key tasks and systems: Ventilation and Air Conditioning (RLT): Installation of hygienic air handling units, supply\/exhaust units, and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5386,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[8],"tags":[],"class_list":["post-5384","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nowe-projekty"],"translation":{"provider":"WPGlobus","version":"3.0.0","language":"en","enabled_languages":["pl","en","de","ru"],"languages":{"pl":{"title":true,"content":true,"excerpt":false},"en":{"title":true,"content":true,"excerpt":false},"de":{"title":true,"content":true,"excerpt":false},"ru":{"title":true,"content":true,"excerpt":false}}},"acf":[],"_links":{"self":[{"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/posts\/5384","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/comments?post=5384"}],"version-history":[{"count":9,"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/posts\/5384\/revisions"}],"predecessor-version":[{"id":5405,"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/posts\/5384\/revisions\/5405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/media\/5386"}],"wp:attachment":[{"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/media?parent=5384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/categories?post=5384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/expateam.com\/en\/wp-json\/wp\/v2\/tags?post=5384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}